AISHAT A. OWOLABI aishaowolabi@yahoo.com (713-478-8937) EDUCATION: Master
of Project Management (MPM) Devry
University (Keller Graduate School of Management, Houston Texas) (2015) Bachelor
of Science (Communication Art) Lagos
State University, Lagos Nigeria (December 2004) PMI-SP
and PMP Certifications – Ongoing SUMMARY OF EXPERIENCE Ten years experience in project planning, control and
scheduling. My experience cuts across oil & gas, Engineering, and
construction industry (EPCM). Skillful at building project schedules
from start to finish, progress monitoring, reporting, resource allocation,
forecasting, earned value management,
Critical path analysis and performance baseline measurement on multiple
projects. SYSTEMS PROFICIENCY Primavera
P6 (6.0 &7.0 and 8.3), MS Project (2010 and 2013), SAP-BPC, MS Word, MS
Excel, Power point, Outlook SHIPCOM
WIRELESS Houston Texas, Contract (October 2014 To Date) Project
Planner/Scheduler (Veteran Affairs Point of Use Project $275 million) v Worked with 10-21
remote site Project Implementation Leads to maintain and update detailed
level implementation schedules for all the 10 VA POU sites. v Tracking the
performance of the project by ensuring “Progress Tracker” reflects the true
progress of work accomplished on all 10-21 VA POU sites for the Veteran
Affairs Point Of Use Project. v Ensure site schedules
are accurate, up to date, and reflect all work accomplished during all phases
of the contract. v Performed critical
thinking measures to ensure that the overall schedule is compliant with DCMA
14-Point Assessment. v Worked with Senior
Project Planner to assist with internal and External reporting. v Assist Senior Project
Planner with program level Earned Value Management. v Conducting Schedule
trend analysis. v Review/update of the
various program management documents in the PMO. v Ensuring and
recalculation of formula for all 10 Veteran Affairs sites and comparing the
percentage complete to the detailed project schedule v Run Acumen Fuse for
all Site Plan to ensure schedule overall health based on DCMA 14-Point
Assessment standards. v Preparation of
Dashboard, posting all information to the Internal and External Share point. v Schedule weekly
meetings through with Implementation Site Leads to discuss recurring issues
that would impact the project “Go live” and project completion date. v Preparation of
activity report detailing issues/concerns while tracking Project percentage
complete and comparing with various overall performance through performance
baseline measurement. BURROW
GLOBAL COMPANIES Houston Texas, Contract (February 2014 to September 2014) Project
Scheduler Specialist (Kinder Morgan Cow Canyon Expansion Project, Total
Ethylene Processing Unit Project, Total FEL 2 Project) ($110Million project) v Built the Level 2
& 3 Project Schedule for Kinder Morgan CO2 Cow Canyon plant expansion
project for Cluster 1, 2, 3, and 4 in Cortez, Colorado. v Monitor multiple
schedules (Kinder Morgan Level 3 Baseline Schedule, Kinder Morgan Level 2
Schedule and the Total Ethylene Processing Unit FEL3 schedule, Total
Refrigerator Storage Construction Project in Primavera P6 and various
projects in MS-Project 2013 respectively. v Man-hour loading and
analyzing Estimate to Complete Labor Unit and advising the PM as required. v Preparation of
various management reports using Primavera P6. v Analyze critical path and constraints
to determine the effect of changes to the schedule. v Analyzing variances in cost and
schedule performance against Baseline. v Planned, developed
and setup the Integrated Schedule in Primavera P6 for Engineering Design,
Procurement and Construction (EPC) schedule for the company Project. v Preparing initial CPM
and WBS with manpower requirements, issuing a draft to the project team for
review and compliance, to ensure scheduling requirements are being met
and that it conforms to good CPM scheduling practice to determine
whether it can be improved to more clearly or more accurately represents the
project scope, and Execution
plan.
v Working closely with various
disciplines and project teams to ensure the accuracy and completeness of the
schedules. v Analyze and highlight the overall
schedule impact of any variance and change order. v Maintained change management system
identifying variances from original scope of work v Promptly report any schedule slippage
to the Planning/Scheduling Lead and Project Manager so that appropriate
actions may be taken to mitigate delays TURNER AND TOWNSEND Houston Texas, Contract
(March 2013 – December 2013) Project Planning /Scheduling (Shell Oil
Gulf Coast Gas To Liquid Project) ($12.5 billion project) v Creating detail construction schedule
for Above Ground (A/G) and Underground (U/G) Pipelines for the Gulf Coast Gas
to Liquid Project (over $12.5 billion project) at Shell v Review sub-contractor schedules and
consulting with various disciplines lead on request for update communication
to ensure milestones and project objective is achieved. v
Preparation of various
management reports including 30, 60 and 90 day look-head. v
Decomposition of Work
Breakdown Structures (WBS) into work packages for better interpretation and
understand by all project leads. v
Preparation of S-Curve
showing relationship and manpower distribution between phase 1 & Phase 2
and across the BDP/define phase. v
Participate and analyzing
of project flow diagram using Gantt Chart displays and histograms in
Primavera. v
Resource loading of over
80 million BDP man-hours for the Stick Build/Modularization for both Phase 1
(Train 1) and Phase 2 (Train 2). v
Conducted and
participated in Shell Safety and Project Planners review meetings analyzing
and exchanging ideas on lessons learned from similar projects. v
Carried out resource
leveling where necessary to avoid over- allocation of resources v
Worked closely with
estimators, risk evaluators, project sponsor and stakeholders by ensuring all
interest are well represented and understand by all parties. v Updating Level 2 and 3 BDP Schedule
using data from the EPCMs v Support the Project Team in the
implementation of an integrated cross functional EPC master schedule for the
Gulf Coast Gas to Liquid project for Shell. v Conduct the required project schedule
analysis, critical path analysis and near critical path analysis for Shell
Gulf Coast Gas to Liquid Project v Analyze deviations from the baseline
in the Project Master schedule highlighting bottlenecks/delays and propose
corrective actions. SRM GROUP, Houston
Texas (May 2010 – Dec 2012) Project Control/Scheduler ($300Million Jefferson Refinery,
Winnie Texas) v Responsible for creating WBS, Activity
coding and Deliverable Activities, maintaining Logic, Status update, CPM
Analysis, Trending, and Forecasting for Jefferson Refinery expansion project.
v Hands on contribution to the
development and maintenance of Work Breakdown Structure (WBS) and that lead
to the establishment of a cost/schedule baseline to move project forward. v Evaluated durations against historical
or similar projects by liaising with construction managers and
superintendents to determine work durations. v Communicated project status report to
project team and client via weekly meetings. v Identify Critical Path Activities
(CPA) and near critical and advise project team accordingly.
Integrating subcontract schedules with project master schedule. v Generated monthly
progress status reports, progress curves and reconcile committed costs to
actual costs on a monthly basis. v Developed manpower
histograms to evaluate resource demand levels for all current and
proposed projects. v Developed, manage, update, and monitor
individual project schedules and integrated overall master program schedule. v Evaluated durations against historical
or similar projects by liaising with construction managers and
superintendents to determine work durations. Nigeria National
Petroleum Corporation (Exploration and Refinery) (Jan 2005 - Dec
2009)
Project Planner/ Scheduler Prepared Work Breakdown Structure (WBS) and activities on
extensive piping for closed loop sample, safety shower & eye wash
upgrade, and recovery oil tank projects at Warri refinery. v Analyzed
construction activities and Identify schedule key milestones dates for
engineering, procurement and construction and all critical Items as specified
in the contract requirement v Established project
WBS and activities with project manager and project engineers on some of our
capital projects such as fire upgrade system, rotating equipment’s such as
oil recovery pump installation etc. v Gather information
from the project team to develop Project Execution Schedule, Project
Execution Plan(CPM), Work Breakdown Structure v Monitoring project
expenses against budget, monitoring weekly on-site activities, monitoring and
prioritizing procurement of material v Creating monthly cost
reports, developed corporate monthly report v Reporting to the
Planning/Scheduling Lead and Manager, responsibility includes prepare the
Project EPC Schedule based upon input from the Project Engineer and his field
staff and the subcontractors v Update the Project
Construction Schedule on a regular basis based upon input from the Project
Engineer and his/her field staff and the subcontractors v Close out the EPC
Schedule at completion of the project to reflect the final actual start and
completion dates of all construction activities. REFERENCE Furnished on request. Owolabi, A.